Gulf Contracting Co.United Arab Emirates · منذ 5 شهر
Shipping marks were wrong on two pallets; supplier issued a credit.
الصورة 1 من 1 · الحديد والمعادن| الكمية (طن) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 51+ | $1,464 | 36 يوم |
Deformed Rebar B500B 16mm — Standard. Supplied by Al Karnak Steel Mills from Cairo. Minimum order 51 MT, lead time 36 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Shipping marks were wrong on two pallets; supplier issued a credit.
Communication in English and Arabic was quick, usually same day.
Communication in English and Arabic was quick, usually same day.
Loading at the port took longer than agreed, product itself is fine.
Technical team answered spec questions properly before the order.














