Gulf Contracting Co.Saudi Arabia · منذ 5 شهر
Technical team answered spec questions properly before the order.
الصورة 1 من 1 · الحديد والمعادن| الكمية (طن) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 59–590 | $1,546 | 41 يوم |
| 591–2,950 | $1,368 | 47 يوم |
| 2,951+ | $1,267 | 53 يوم |
Hex Bolt Grade 8.8 Zinc — Heavy Duty. Supplied by Al Karnak Steel Mills from Cairo. Minimum order 59 MT, lead time 41 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Technical team answered spec questions properly before the order.
Third order this year, no complaints on lead time or moisture content.
Technical team answered spec questions properly before the order.
Slight colour variation between batches, resolved on the next shipment.
Third order this year, no complaints on lead time or moisture content.
Shipping marks were wrong on two pallets; supplier issued a credit.
Lead time was two days shorter than quoted. Packaging arrived intact.














