Gulf Contracting Co.Kuwait · منذ 1 شهر
Pallet wrapping could be stronger for sea freight in summer.
الصورة 1 من 1 · الحديد والمعادن| الكمية (طن) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 11+ | $2,216 | 34 يوم |
Galvanised Steel Sheet Z275 — OEM. Supplied by Al Karnak Steel Mills from Cairo. Minimum order 11 MT, lead time 34 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Pallet wrapping could be stronger for sea freight in summer.
Loading at the port took longer than agreed, product itself is fine.














