Gulf Contracting Co.Egypt · منذ 1 سنة
Lead time was two days shorter than quoted. Packaging arrived intact.
الصورة 1 من 1 · البلاستيك والبوليمرات| الكمية (طن) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 24–240 | $2,839 | 28 يوم |
| 241–1,200 | $2,513 | 34 يوم |
| 1,201+ | $2,327 | 40 يوم |
HDPE Blow Moulding Granules — OEM. Supplied by Al Faris Polymers Group from Algiers. Minimum order 24 MT, lead time 28 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Lead time was two days shorter than quoted. Packaging arrived intact.
Certificates were provided without chasing. Invoicing was accurate.
Communication in English and Arabic was quick, usually same day.



















