Medina Packaging LtdAlgeria · منذ 7 شهر
Lead time was two days shorter than quoted. Packaging arrived intact.
الصورة 1 من 1 · البلاستيك والبوليمرات| الكمية (طن) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 3–30 | $2,501 | 11 يوم |
| 31–150 | $2,214 | 17 يوم |
| 151+ | $2,050 | 23 يوم |
LDPE Shrink Film Roll — Export Grade. Supplied by Al Faris Polymers Group from Algiers. Minimum order 3 MT, lead time 11 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Lead time was two days shorter than quoted. Packaging arrived intact.



















