Third order this year, no complaints on lead time or moisture content.
الصورة 1 من 1 · الحديد والمعادنكمرة حديد IPE 200 — صناعي
| الكمية (طن) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 51–510 | $3,544 | 11 يوم |
| 511–2,550 | $3,137 | 17 يوم |
| 2,551+ | $2,905 | 23 يوم |
Structural I-Beam IPE 200 — Industrial. Supplied by Al Karnak Steel Group from Damietta. Minimum order 51 MT, lead time 11 days.
- الدرجة
- B500B / S275JR
- التفاوت المسموح
- EN 10080
- الطلاء
- Mill finish
- التغليف
- 2 MT bundles
- رمز النظام المنسق
- 7214.20
- Origin
- Egypt
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Third order this year, no complaints on lead time or moisture content.
Samples matched the bulk delivery exactly. Will order again.
Loading at the port took longer than agreed, product itself is fine.
Lead time was two days shorter than quoted. Packaging arrived intact.
Shipping marks were wrong on two pallets; supplier issued a credit.
Shipping marks were wrong on two pallets; supplier issued a credit.
Certificates were provided without chasing. Invoicing was accurate.
Slight colour variation between batches, resolved on the next shipment.
Slight colour variation between batches, resolved on the next shipment.
Shipping marks were wrong on two pallets; supplier issued a credit.
Third order this year, no complaints on lead time or moisture content.
Technical team answered spec questions properly before the order.
Loading at the port took longer than agreed, product itself is fine.
Certificates were provided without chasing. Invoicing was accurate.
Good price at volume but MOQ is high for a first order.
Certificates were provided without chasing. Invoicing was accurate.
منتجات أخرى من مجموعة الكرنك للحديد










منتجات مشابهة










