Gulf Contracting Co.United Arab Emirates · منذ 1 شهر
Consistent quality across three repeat orders. Documentation was complete.
الصورة 1 من 1 · الحديد والمعادن| الكمية (طن) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 38+ | $1,342 | 18 يوم |
Galvanised Steel Sheet Z275 — Export Grade. Supplied by Al Karnak Steel Group from Damietta. Minimum order 38 MT, lead time 18 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Consistent quality across three repeat orders. Documentation was complete.
Communication in English and Arabic was quick, usually same day.
Loading at the port took longer than agreed, product itself is fine.
Third order this year, no complaints on lead time or moisture content.
Technical team answered spec questions properly before the order.
Slight colour variation between batches, resolved on the next shipment.
Technical team answered spec questions properly before the order.



















