Lead time was two days shorter than quoted. Packaging arrived intact.
Image 1 of 1 · Steel & MetalsSeamless Carbon Pipe Sch40 — OEM
| Quantity (MT) | Unit price | Lead time |
|---|---|---|
| 47–470 | $1,069 | 38 days |
| 471–2,350 | $946.08 | 44 days |
| 2,351+ | $876 | 50 days |
Seamless Carbon Pipe Sch40 — OEM. Supplied by Al Jazeera Steel Establishment from Port Said. Minimum order 47 MT, lead time 38 days.
- Grade
- B500B / S275JR
- Tolerance
- EN 10080
- Coating
- Mill finish
- Packing
- 2 MT bundles
- HS code
- 7214.20
- Origin
- Egypt
| Route | Mode | Transit | Note |
|---|
Communication in English and Arabic was quick, usually same day.
Consistent quality across three repeat orders. Documentation was complete.
Good price at volume but MOQ is high for a first order.
Certificates were provided without chasing. Invoicing was accurate.
Lead time was two days shorter than quoted. Packaging arrived intact.
Lead time was two days shorter than quoted. Packaging arrived intact.
Shipping marks were wrong on two pallets; supplier issued a credit.
Samples matched the bulk delivery exactly. Will order again.
Loading at the port took longer than agreed, product itself is fine.
Communication in English and Arabic was quick, usually same day.
Third order this year, no complaints on lead time or moisture content.
Good price at volume but MOQ is high for a first order.
Pallet wrapping could be stronger for sea freight in summer.
Other products from Al Jazeera Steel Establishment







Similar products










