Nour Industrial SupplyUnited Arab Emirates · 1 mo ago
Lead time was two days shorter than quoted. Packaging arrived intact.
Image 1 of 1 · Steel & Metals| Quantity (MT) | Unit price | Lead time |
|---|---|---|
| 40+ | $2,509 | 43 days |
Deformed Rebar B500B 16mm — Export Grade. Supplied by Al Jazeera Steel Establishment from Port Said. Minimum order 40 MT, lead time 43 days.
| Route | Mode | Transit | Note |
|---|
Lead time was two days shorter than quoted. Packaging arrived intact.
Slight colour variation between batches, resolved on the next shipment.
Technical team answered spec questions properly before the order.
Pallet wrapping could be stronger for sea freight in summer.
Pallet wrapping could be stronger for sea freight in summer.
















