Beit El KhayyatEgypt · 1 mo ago
Technical team answered spec questions properly before the order.
Image 1 of 1 · Steel & Metals| Quantity (MT) | Unit price | Lead time |
|---|---|---|
| 11+ | $1,535 | 7 days |
Seamless Carbon Pipe Sch40 — Heavy Duty. Supplied by Al Faris Steel Co. W.L.L. from 10th of Ramadan. Minimum order 11 MT, lead time 7 days.
| Route | Mode | Transit | Note |
|---|
Technical team answered spec questions properly before the order.
Pallet wrapping could be stronger for sea freight in summer.
Lead time was two days shorter than quoted. Packaging arrived intact.
Slight colour variation between batches, resolved on the next shipment.
Lead time was two days shorter than quoted. Packaging arrived intact.
Technical team answered spec questions properly before the order.
Samples matched the bulk delivery exactly. Will order again.
Communication in English and Arabic was quick, usually same day.



















