Saphir DistributionUnited Arab Emirates · 6 mo ago
Lead time was two days shorter than quoted. Packaging arrived intact.
Image 1 of 1 · Steel & Metals| Quantity (MT) | Unit price | Lead time |
|---|---|---|
| 24+ | $2,768 | 32 days |
Galvanised Steel Sheet Z275 — Export Grade. Supplied by Al Faris Steel Co. W.L.L. from 10th of Ramadan. Minimum order 24 MT, lead time 32 days.
| Route | Mode | Transit | Note |
|---|
Lead time was two days shorter than quoted. Packaging arrived intact.
Shipping marks were wrong on two pallets; supplier issued a credit.
Certificates were provided without chasing. Invoicing was accurate.
Pallet wrapping could be stronger for sea freight in summer.
Shipping marks were wrong on two pallets; supplier issued a credit.
Pallet wrapping could be stronger for sea freight in summer.
Samples matched the bulk delivery exactly. Will order again.



















