Gulf Contracting Co.Egypt · منذ 1 سنة
Slight colour variation between batches, resolved on the next shipment.
الصورة 1 من 1 · البلاستيك والبوليمرات| الكمية (طن) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 25+ | $1,697 | 36 يوم |
HDPE Pipe PE100 SDR11 — Premium. Supplied by Bab El Salam Polymers Group from 10th of Ramadan. Minimum order 25 MT, lead time 36 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Slight colour variation between batches, resolved on the next shipment.
Lead time was two days shorter than quoted. Packaging arrived intact.















