Gulf Contracting Co.Saudi Arabia · منذ 11 شهر
Pallet wrapping could be stronger for sea freight in summer.
الصورة 1 من 1 · القطن والخيوط| الكمية (كجم) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 8,921–89,210 | $2.72 | 26 يوم |
| 89,211–446,050 | $2.41 | 32 يوم |
| 446,051+ | $2.23 | 38 يوم |
Combed Ring Spun Yarn 30/1 — OEM. Supplied by Nile Delta Cotton Factory from Dammam. Minimum order 8921 kg, lead time 26 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Pallet wrapping could be stronger for sea freight in summer.
Certificates were provided without chasing. Invoicing was accurate.



















