Gulf Contracting Co.Saudi Arabia · منذ 6 شهر
Pallet wrapping could be stronger for sea freight in summer.
الصورة 1 من 1 · الملابس والأزياء| الكمية (قطعة) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 2,844–28,440 | $6.58 | 23 يوم |
| 28,441–142,200 | $5.82 | 29 يوم |
| 142,201+ | $5.39 | 35 يوم |
Slim Fit Chino Trousers — Grade A. Supplied by Al Safwa Garments Establishment from Doha. Minimum order 2844 pc, lead time 23 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Pallet wrapping could be stronger for sea freight in summer.
Communication in English and Arabic was quick, usually same day.
Loading at the port took longer than agreed, product itself is fine.

















