Saphir DistributionTunisia · منذ 2 شهر
Communication in English and Arabic was quick, usually same day.
الصورة 1 من 1 · المنسوجات والأقمشة| الكمية (متر) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 1,489–14,890 | $6.76 | 45 يوم |
| 14,891–74,450 | $5.98 | 51 يوم |
| 74,451+ | $5.54 | 57 يوم |
Cotton Poplin Yarn-Dyed — Industrial. Supplied by Al Nour Textiles Group from Port Said. Minimum order 1489 m, lead time 45 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Communication in English and Arabic was quick, usually same day.
Samples matched the bulk delivery exactly. Will order again.
Communication in English and Arabic was quick, usually same day.
Loading at the port took longer than agreed, product itself is fine.



















