Medina Packaging LtdEgypt · منذ 1 شهر
Pallet wrapping could be stronger for sea freight in summer.
الصورة 1 من 1 · الأحذية| الكمية (زوج) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 1,556+ | $21.01 | 30 يوم |
Steel Toe Safety Boot S3 — Grade A. Supplied by Al Amal Footwear Group from Dubai. Minimum order 1556 pr, lead time 30 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Pallet wrapping could be stronger for sea freight in summer.
Consistent quality across three repeat orders. Documentation was complete.
Slight colour variation between batches, resolved on the next shipment.
Slight colour variation between batches, resolved on the next shipment.

















