Beit El KhayyatEgypt · منذ 2 شهر
Pallet wrapping could be stronger for sea freight in summer.
الصورة 1 من 1 · الحديد والمعادن| الكمية (طن) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 55+ | $3,004 | 33 يوم |
Seamless Carbon Pipe Sch40 — Grade A. Supplied by Orient Steel Factory from Cairo. Minimum order 55 MT, lead time 33 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Pallet wrapping could be stronger for sea freight in summer.
Lead time was two days shorter than quoted. Packaging arrived intact.















