Consistent quality across three repeat orders. Documentation was complete.
الصورة 1 من 1 · القطن والخيوطخيط أوبن إند ٢٠/١ — درجة أولى
| الكمية (كجم) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 7,312–73,120 | $3.48 | 43 يوم |
| 73,121–365,600 | $3.08 | 49 يوم |
| 365,601+ | $2.85 | 55 يوم |
Carded Open End Yarn 20/1 — Grade A. Supplied by Cedar Cotton Export from Dubai. Minimum order 7312 kg, lead time 43 days.
- طول التيلة
- 35.5 mm
- الميكرونير
- 3.9
- المتانة
- 44 g/tex
- التغليف
- 220 kg bales
- رمز النظام المنسق
- 5201.00
- Origin
- United Arab Emirates
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Certificates were provided without chasing. Invoicing was accurate.
Communication in English and Arabic was quick, usually same day.
Slight colour variation between batches, resolved on the next shipment.
Third order this year, no complaints on lead time or moisture content.
Certificates were provided without chasing. Invoicing was accurate.
Third order this year, no complaints on lead time or moisture content.
Samples matched the bulk delivery exactly. Will order again.
Loading at the port took longer than agreed, product itself is fine.
Shipping marks were wrong on two pallets; supplier issued a credit.
Certificates were provided without chasing. Invoicing was accurate.
منتجات أخرى من الأرز لتصدير القطن







منتجات مشابهة










