Beit El KhayyatTunisia · منذ 7 شهر
Technical team answered spec questions properly before the order.
الصورة 1 من 1 · المنسوجات والأقمشة| الكمية (متر) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 3,876–38,760 | $8.63 | 31 يوم |
| 38,761–193,800 | $7.64 | 37 يوم |
| 193,801+ | $7.07 | 43 يوم |
Cotton Poplin Yarn-Dyed — Premium. Supplied by Al Diyar Textiles & Sons from Alexandria. Minimum order 3876 m, lead time 31 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Technical team answered spec questions properly before the order.
Lead time was two days shorter than quoted. Packaging arrived intact.
Certificates were provided without chasing. Invoicing was accurate.
Third order this year, no complaints on lead time or moisture content.
Samples matched the bulk delivery exactly. Will order again.
Pallet wrapping could be stronger for sea freight in summer.
Communication in English and Arabic was quick, usually same day.
Third order this year, no complaints on lead time or moisture content.
Loading at the port took longer than agreed, product itself is fine.



















