Saphir DistributionEgypt · منذ 6 شهر
Lead time was two days shorter than quoted. Packaging arrived intact.
الصورة 1 من 1 · المنسوجات والأقمشة| الكمية (متر) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 3,196–31,960 | $11.79 | 31 يوم |
| 31,961–159,800 | $10.43 | 37 يوم |
| 159,801+ | $9.66 | 43 يوم |
Flame-Retardant Twill — Grade A. Supplied by Al Nour Textiles Mills from 10th of Ramadan. Minimum order 3196 m, lead time 31 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Lead time was two days shorter than quoted. Packaging arrived intact.
Samples matched the bulk delivery exactly. Will order again.
Technical team answered spec questions properly before the order.
Technical team answered spec questions properly before the order.
Pallet wrapping could be stronger for sea freight in summer.



















