Beit El KhayyatSaudi Arabia · منذ 2 شهر
Third order this year, no complaints on lead time or moisture content.
الصورة 1 من 1 · الملابس والأزياء| الكمية (قطعة) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 1,191–11,910 | $17.60 | 8 يوم |
| 11,911–59,550 | $15.58 | 14 يوم |
| 59,551+ | $14.43 | 20 يوم |
Heavyweight Crewneck Sweatshirt — Industrial. Supplied by Al Rashid Garments Factory from Alexandria. Minimum order 1191 pc, lead time 8 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Third order this year, no complaints on lead time or moisture content.
Third order this year, no complaints on lead time or moisture content.
Loading at the port took longer than agreed, product itself is fine.
Communication in English and Arabic was quick, usually same day.
Consistent quality across three repeat orders. Documentation was complete.
Third order this year, no complaints on lead time or moisture content.
Slight colour variation between batches, resolved on the next shipment.













