Gulf Contracting Co.Saudi Arabia · منذ 5 شهر
Slight colour variation between batches, resolved on the next shipment.
الصورة 1 من 1 · البلاستيك والبوليمرات| الكمية (طن) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 5–50 | $2,695 | 40 يوم |
| 51–250 | $2,386 | 46 يوم |
| 251+ | $2,209 | 52 يوم |
HDPE Pipe PE100 SDR11 — OEM. Supplied by Al Hoda Polymers Trading Co. from Zarqa. Minimum order 5 MT, lead time 40 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Slight colour variation between batches, resolved on the next shipment.
Pallet wrapping could be stronger for sea freight in summer.



















