Andalus Retail GroupSaudi Arabia · منذ 1 سنة
Loading at the port took longer than agreed, product itself is fine.
الصورة 1 من 1 · الحديد والمعادن| الكمية (طن) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 48+ | $1,688 | 29 يوم |
Galvanised Steel Sheet Z275 — Standard. Supplied by Al Diyar Steel Factory from Damietta. Minimum order 48 MT, lead time 29 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Loading at the port took longer than agreed, product itself is fine.
Communication in English and Arabic was quick, usually same day.
Slight colour variation between batches, resolved on the next shipment.














