Saphir DistributionUnited Arab Emirates · منذ 1 شهر
Communication in English and Arabic was quick, usually same day.
الصورة 1 من 1 · القطن والخيوط| الكمية (كجم) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 2,936–29,360 | $6.55 | 39 يوم |
| 29,361–146,800 | $5.80 | 45 يوم |
| 146,801+ | $5.37 | 51 يوم |
Giza 94 Extra Long Staple Cotton — Industrial. Supplied by Al Diyar Cotton & Sons from Damietta. Minimum order 2936 kg, lead time 39 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Communication in English and Arabic was quick, usually same day.
Pallet wrapping could be stronger for sea freight in summer.



















