Gulf Contracting Co.Morocco · منذ 2 شهر
Third order this year, no complaints on lead time or moisture content.
الصورة 1 من 1 · الأحذية| الكمية (زوج) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 461+ | $12.05 | 26 يوم |
Leather Insole Cambrelle — Industrial. Supplied by Nile Delta Footwear Manufacturing from Basra. Minimum order 461 pr, lead time 26 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Third order this year, no complaints on lead time or moisture content.
Communication in English and Arabic was quick, usually same day.
Technical team answered spec questions properly before the order.
Loading at the port took longer than agreed, product itself is fine.
Shipping marks were wrong on two pallets; supplier issued a credit.
Slight colour variation between batches, resolved on the next shipment.
Certificates were provided without chasing. Invoicing was accurate.
Shipping marks were wrong on two pallets; supplier issued a credit.














