Nour Industrial SupplySaudi Arabia · منذ 5 شهر
Technical team answered spec questions properly before the order.
الصورة 1 من 1 · الملابس والأزياء| الكمية (قطعة) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 1,653–16,530 | $30.21 | 27 يوم |
| 16,531–82,650 | $26.74 | 33 يوم |
| 82,651+ | $24.76 | 39 يوم |
Kids Printed T-Shirt Set — Standard. Supplied by Levant Garments Factory from Beirut. Minimum order 1653 pc, lead time 27 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Technical team answered spec questions properly before the order.
Shipping marks were wrong on two pallets; supplier issued a credit.
Third order this year, no complaints on lead time or moisture content.



















