Nour Industrial SupplyAlgeria · منذ 3 شهر
Lead time was two days shorter than quoted. Packaging arrived intact.
الصورة 1 من 1 · الملابس والأزياء| الكمية (قطعة) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 3,577+ | $33.21 | 29 يوم |
Kids Printed T-Shirt Set — Heavy Duty. Supplied by Nile Delta Garments Industries from Damietta. Minimum order 3577 pc, lead time 29 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Lead time was two days shorter than quoted. Packaging arrived intact.
Third order this year, no complaints on lead time or moisture content.
Pallet wrapping could be stronger for sea freight in summer.















