Beit El KhayyatEgypt · منذ 3 شهر
Lead time was two days shorter than quoted. Packaging arrived intact.
الصورة 1 من 1 · الزجاج والسيراميك| الكمية (م²) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 873–8,730 | $64.31 | 35 يوم |
| 8,731–43,650 | $56.93 | 41 يوم |
| 43,651+ | $52.71 | 47 يوم |
Mirror Silvered 4mm — Industrial. Supplied by Al Hoda Glass Export from Tripoli. Minimum order 873 m², lead time 35 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Lead time was two days shorter than quoted. Packaging arrived intact.
Lead time was two days shorter than quoted. Packaging arrived intact.



















