Beit El KhayyatSaudi Arabia · منذ 8 شهر
Pallet wrapping could be stronger for sea freight in summer.
الصورة 1 من 1 · القطن والخيوط| الكمية (كجم) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 5,878–58,780 | $6.88 | 17 يوم |
| 58,781–293,900 | $6.09 | 23 يوم |
| 293,901+ | $5.64 | 29 يوم |
Mercerised Cotton Yarn 40/2 — Grade A. Supplied by Al Faris Cotton Establishment from Dubai. Minimum order 5878 kg, lead time 17 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Pallet wrapping could be stronger for sea freight in summer.
Loading at the port took longer than agreed, product itself is fine.
Pallet wrapping could be stronger for sea freight in summer.



















