Medina Packaging LtdJordan · منذ 3 شهر
Pallet wrapping could be stronger for sea freight in summer.
الصورة 1 من 1 · الأحذية| الكمية (زوج) | سعر الوحدة | مدة التوريد |
|---|---|---|
| 759–7,590 | $37.26 | 7 يوم |
| 7,591–37,950 | $32.98 | 13 يوم |
| 37,951+ | $30.54 | 19 يوم |
PU Rain Boot Knee High — OEM. Supplied by Al Amal Footwear Trading Co. from Sharjah. Minimum order 759 pr, lead time 7 days.
| المسار | وسيلة النقل | مدة النقل | ملاحظة |
|---|
Pallet wrapping could be stronger for sea freight in summer.
Certificates were provided without chasing. Invoicing was accurate.
Shipping marks were wrong on two pallets; supplier issued a credit.
Lead time was two days shorter than quoted. Packaging arrived intact.
Technical team answered spec questions properly before the order.









