Saphir DistributionAlgeria · 4 mo ago
Slight colour variation between batches, resolved on the next shipment.
Image 1 of 1 · Footwear| Quantity (pr) | Unit price | Lead time |
|---|---|---|
| 1,669+ | $25.13 | 20 days |
TPU Outsole Unit — Heavy Duty. Supplied by Al Manara Footwear Co. W.L.L. from Sharjah. Minimum order 1669 pr, lead time 20 days.
| Route | Mode | Transit | Note |
|---|
Slight colour variation between batches, resolved on the next shipment.
Third order this year, no complaints on lead time or moisture content.
Technical team answered spec questions properly before the order.
Pallet wrapping could be stronger for sea freight in summer.
Lead time was two days shorter than quoted. Packaging arrived intact.
Shipping marks were wrong on two pallets; supplier issued a credit.
Slight colour variation between batches, resolved on the next shipment.
Technical team answered spec questions properly before the order.









