Gulf Contracting Co.United Arab Emirates · 6 mo ago
Communication in English and Arabic was quick, usually same day.
Image 1 of 1 · Steel & Metals| Quantity (MT) | Unit price | Lead time |
|---|---|---|
| 2–20 | $719.80 | 27 days |
| 21–100 | $637.20 | 33 days |
| 101+ | $590 | 39 days |
Copper Cathode Grade A — Heavy Duty. Supplied by Al Bahr Steel Trading Co. from Alexandria. Minimum order 2 MT, lead time 27 days.
| Route | Mode | Transit | Note |
|---|
Communication in English and Arabic was quick, usually same day.
Technical team answered spec questions properly before the order.
Lead time was two days shorter than quoted. Packaging arrived intact.
Pallet wrapping could be stronger for sea freight in summer.
Lead time was two days shorter than quoted. Packaging arrived intact.

















